TB 9-2350-368-25 2-36 e. Regulator Cable (Four Leads) Bill Of Materials Item Nomenclature Part Number NSN Qty M113A2/M113A3/M548A1 Hardware 1 Receptacle Connector 8713567 5935-00-502-9262 1 2 Nonmetallic Bushing 8341848 5365-00-303-4841 2 3 Knurled Plain Nut 7723309 5310-00-393-6685 2 4 Electrical Connector Plug 8724259 5935-00-081-0400 1 5 Electrical Coupling Nut 7716634-1 5975-01-151-7033 1 6 Electrical Wire M13486/1-11 6145-00-538-8219 A/R 7 Electrical Insulation Tape 07099 - MS70T09-S 5970-00-955-9956 A/R Electrical Insulation Sleeving 78286-S6132- 61003-9 5970-00-004-4056 A/R 8 Band Marker M43436/1-1 9905-00-752-4649 8 M548A3 Hardware 9 Connector MS3456W32-1P 1 10 Connect 8713567 1 11 Bushing 8341848 1 12 Nut 7723309 1 13 Connect 7716781 1 14 Bushing 8376776 1 15 Nut 7723308 1 16 Electrical Wire AWG 0 M13486/1-11 6145-00-538-8219 A/R 17 Electrical Wire AWG 4 M13486/1-11 6145-00-538-8219 A/R 18 Electrical Wire AWG 14 M13486/1-11 6145-00-538-8219 A/R 19 Electrical Insulation Tape 07099 - MS70T09-S 5970-00-955-9956 A/R Electrical Insulation Sleeving 78286-S6132- 61003-9 5970-00-004-4056 A/R NOTE Although circuit leads numbers between the 200-amp voltage system and the 100-amp voltage systems are different, the same harness may be used. The important thing is the location of the regulators. The circuit leads must be long enough to reach from the 100-amp regulator to the 100-amp generator system and the 200-amp regulator leads must reach the 200-amp generator system. 1. Measure from the 100-amp regulator to generator and from the 200-amp regulator to the generator. NOTE See Figure 2-22 for regulator cable art. 2. This cable can be used for either the 100-amp or 200-amp regulator, so cut the wires about two or three inches longer than farthest distance. 3. Connect four AWG 4 electrical leads (6) measured in step 1, to two receptacles (1-5). 4. Label leads (6), using band markers (8), from pin B, 2A; pin C, 2; pin D, 1; and pin E, 1A. 5. Install electrical insulation tape/sleeving (7) on all leads (6).