TB 9-2350-368-25 2-16 g. Battery Box Bill Of Materials Item Nomenclature Part Number NSN Qty 2” by 2” by 1/4” Steel Angle 1 48 inches (121.9 cm) 2 2” by 3” by 1/4” Steel Angle 2 11-1/4 inches (28.6 cm) 2 2” by 2” by 1/4” Steel Angle 3 15 inches (38.1 cm) 4 1. Cut two steel angles (1) final length of 48 inches with 45° angle on each end. See Figure 2-11. 2. Cut two steel angles (2) final length of 11-1/4 inches with 45° angle on each end. See Figure 2-11. 3. Weld two steel angles (1) and two steel angles (2) together. See Figure 2-11. 4. On the 3-inch side, scribe a line 7 inches down from the top of steel angle (3) and another 6-7/8 inches from the 7-inch line. 5. Scribe two lines 5/8 inch on the 3-inch side from each side of steel angle (3). 6. Drill four 9/32-inch holes where the scribed lines intersect, to mount the STE/ICE shunt. See Figure 2- 11. 7. Scribe a line 9-1/4 inches down from the top of steel angle (3) and another 2-53/64 inches down from 9-1/4 inch line. See Figure 2-11. 8. Scribe a line 7/8 inch from edge of steel angle (3). See Figure 2-11. 9. Drill two 7/16-inch holes where the scribed lines intersect, to mount bus bar. See Figure 2-11. 10. Weld four steel angles (3) 12 inches from ends of two steel angles (1) on center tubing. See Figure 2-11. 11. Position and weld four steel angles (3) on the rear cross horizontal tubing, and the other on rear perpendicular tubing. See Figure 2-11.