TB-9-2350-368-25 Powerplant Test Stand M113A2 M113A3 M548A1 M548A3 Download
Page 20 of 120
TB 9-2350-368-25 2-6 11. Cut floor plates (1 through 7) to dimensions shown in Figure 2-5. Tack weld in place as indicated in Figure 2-4. (Items 13 through 17 on Bill of Materials list). Hard weld, if all items are in proper alignment, in accordance with welding specification QQ-A-250. 12. Drill four holes in plate (2) for mounting the 100 amp regulator, using voltage regulator/200 amp regulator face plate (1, Figure 2-12). 13. Test stand base may now be placed on axles and wheels or a skid according to facility requirements. Figure 2-5. Floor Plate Dimensions and Locations