TB-9-2350-277-40&P-4 M121 M1064A3 Crew Modification Kit Volume 4 Download

Page 48 of 100

TB 9-2350-277-40&P-4 INSTALLATION PROCEDURES – Continued 0005 00 0005 00-12 14. Remove endless sling (31) from primary unit enclosure assembly (30) lifting eye. 15. Place cables and ground strap inside primary unit enclosure assembly (30). 16. Secure GPS cable, RCU cable, and power harness to primary unit mounting bracket (34) with tie straps (16). 17. Install enclosure cover (35) on primary unit enclosure assembly (30). Secure with four screws (36) and flat washers (33). TORQUE SCREWS TO 105 LB-FT (142.4 N·m). Figure 11. Primary Unit Enclosure Cover Installation