TB-9-2350-277-40&P-4 M121 M1064A3 Crew Modification Kit Volume 4 Download
Page 29 of 100
TB 9-2350-277-40&P-4 MODIFICATION PROCEDURES 0004 00 0004 00-1 THIS WORK PACKAGE COVERS: Clearance for CREW II Primary Unit (page 0004 00-1). Drill CREW II Cable Port (page 0004 00-3). Drill CREW II Primary Unit Enclosure Mounting (page 0004 00-5). Drill Intercom Unit Mounting (M1068A3 Only) (page 0004 00-6). Drill CREW II Hull Roof RCU and GPS Cable Clamp (page 0004 00-7). Drill CREW II Right Rail Support Bracket RCU and GPS Cable Clamps (page 0004 00-8). INITIAL SETUP: Maintenance Level Sustainment Tools and Special Tools Cutoff Saw, Air Powered (WP 0011, Item 1) Die and Tap Set, Thread Cutting (WP 0011 00, Item 2) Drilling Machine, Upright (WP 0011 00, Item 3) Drill Set, Twist (WP 0011 00, Item 4) General Mechanic’s Tool Kit (WP 0011 00, Item 5) Goggles, Industrial (WP 0011 00, Item 6) Hole Saw Set, Carbide Tipped (WP 0011, Item 7) Magnetic Drill Base Plate/Template (WP 0012 00) Measuring Tape ( WP 0011 00, Item 8) Portable Drill, Electric, 1/2 inch (WP 0011 00, Item 9) Sander, Disk, Electric, Portable (WP 0011 00, Item 10) Materials/Parts Crew II Modification Kit (12498005) Wheel, Cutoff (WP 0013 00, Item 3) Personnel Required Mechanic References TM 43-0139 Equipment Conditions Carrier parked on level ground Engine stopped (TM 9-2350-277-10) Vehicle blocked (TM 9-2350-277-10) CLEARANCE FOR CREW II PRIMARY UNIT WARNING Flammable or explosive compounds can ignite and seriously injure or kill personnel. Remove and stow all flammable and explosive materials from vehicle and surrounding area. CAUTION Remove all equipment and gear from top right side rear area to prevent damage when drilling holes in upper hull.