TB-9-2350-277-40&P-4 M121 M1064A3 Crew Modification Kit Volume 4 Download

Page 18 of 100

TB 9-2350-277-40&P-4 INTRODUCTION – Continued 0001 00 0001 00-4 13. Inspection requirements. a. Prior to kit installation, inspect all mounting provisions for signs of fatigue failure, cracking, and loose or missing attaching hardware. The CREW II kit cannot be installed until certain hull mounting provisions have been completed. See WP 0003 00 and WP 0004 00 for hull preparation procedures. b. Ensure all kit parts are available prior to installation. See WP 0014 00 for a list of kit parts. Inspect all kit parts for signs of cracking or distortion of the supports and brackets, damaged cables, and missing hardware. c. After kit installation, ensure all kit components are mounted securely. Inspect the new cables to ensure they are securely clamped and tied to the existing cables and are not going to be pinched or damaged during carrier operation. 14. Tools and Equipment. a. Commonly-used tools and equipment having application to field support maintenance, in general, furnished by the maintenance activity/contractor. See WP 0011 00. b. Special tools: See WP 0011 00. c. Fabricated tools: See WP 0012 00. 15. Recording and reporting of the installation. a. Reporting requirements. Refer to AR 750-10/DA Pamphlet 750-8. b. Marking equipment. No marking of equipment or vehicle is required. 16. Material change (MC) number. Not applicable. END OF WORK PACKAGE