TB-9-2350-277-40&P-3 M121 M1064A3 Crew Modification Kit Volume 3 Download
Page 45 of 88
TB 9-2350-277-40&P-3 INSTALLATION PROCEDURES – Continued 0005 00 0005 00-11/12 blank INSTALL POWER HARNESS, RCU CABLE, AND RCU TO PDA CABLE NOTE Do not secure cables with tie straps until installation is complete and the cables have been adjusted at both ends. 1. Route power harness (50) from radio/electrical connection (48) and through clamp (43) up to PDA cradle and RCU location. 2. Continue routing power harness (50) from radio/electrical connection (48) to primary unit location. 3. Route RCU cable (51) from primary unit location through two clamps (43) up to PDA cradle and RCU location. 4. Remove screw (52) and lockwasher (53) securing existing loop clamp and wiring harness to turbine housing wall. Retain hardware for re-installation. 5. Install power harness ground lead (54) over existing loop clamp and wiring harness. Secure with screw (52) and lockwasher (53). 6. Secure all loose power harness, RCU cable, and RCU to PDA cable (49) connections to their appropriate bracket assembly with tie straps. Figure 10. Power Harness, RCU Cable, and RCU to PDA Cable Installation END OF WORK PACKAGE