TB-9-2350-277-40&P-1 M121 M1064A3 Crew Modification Kit Volume 1 Download

Page 38 of 100

TB 9-2350-277-40&P-1 INSTALLATION PROCEDURES – Continued 0005 00 0005 00-2 1. Route three stoplight-taillight circuit leads; circuit 21 lead (9), circuit 22 lead (8), and circuit 24 lead (7) thru gasket (12) and CREW II mount assembly (1). Secure stoplight-taillight (11) to CREW II mount assembly (1) with two screws (6) and lockwashers (5). NOTE Do not tighten hardware until installation is complete. 2. Position CREW II mount assembly (1) on top of left fuel tank and secure using two screws (2), lockwashers (3), and washers (4). 3. Attach right bottom of CREW II mount assembly (1) to fuel tank with screw (10), lockwasher (3), washer (4), and lockwasher (5). 4. Secure left bottom of CREW II mount to fuel tank with screw (10), lockwasher (3), and washer (4). 5. Connect three stoplight-taillight circuit leads; circuit 21 lead (9), circuit 22 lead (8), and circuit 24 lead (7) to stoplight-taillight (11). Figure 1. CREW II Mount Assembly Installation