TB-9-2350-277-40&P-1 M121 M1064A3 Crew Modification Kit Volume 1 Download
Page 37 of 100
TB 9-2350-277-40&P-1 INSTALLATION PROCEDURES 0005 00 0005 00-1 THIS WORK PACKAGE COVERS: Install CREW II Mount Assembly (page 0005 00-1). Install Tank Support Mount (page 0005 00-3). Install GPS, RCU, and Primary Power Cables (page 0005 00-4). Install GPS Antenna Kit (page 0005 00-9). Install PDU/RCU Bracket Assembly (page 0005 00-11). Install Antenna Stowage Bracket (page 0005 00-13). Install Enclosure Assembly (page 0005 00-14). INITIAL SETUP: Maintenance Level Sustainment Tools and Special Tools General Mechanic’s Tool Kit (WP 0011 00, Item 4) Measuring Tape (WP 0011 00, Item 6) Endless Sling (WP 0011 00, Item 8) Torque Wrench (WP 0011, Item 9) Materials/Parts Cleaning Compound (WP 0013 00, Item 1) Sealing Compound (WP 0013 00, Item 3) Sealing Compound Primer (WP 0013 00, Item 4) CREW II Modification Kit (12498030) Personnel Required Mechanic Helper (H) References TM 9-2350-277-10 TM 9-2350-277-20 Equipment Conditions Carrier parked on level ground Engine stopped (TM 9-2350-277-10) Vehicle blocked (TM 9-2350-277-10) CREW II cable port drilled (WP 0004 00) Top shelf of vertical ammo rack removed (TM 9-2350-277-20-4) Top door of horizontal ammo rack opened Power plant rear access panel removed (TM 9-2350-277-20-4) Bulkhead drilled for PDA/RCU bracket (WP 0004 00) Antenna stowage bracket holes drilled (WP 0004 00) INSTALL CREW II MOUNT ASSEMBLY NOTE If bar armor is installed, discard all existing hardware and use new hardware for installation. Use additional washers (MS10910174-5) as spacers to shim bar armor to CREW II mounting bracket.