TM-9-2920-225-34 Technical Manual for Generators AMA5102UT 3002AC and 3002AD Download
Page 159 of 262
TM 9-2920-225-34 FRAME 4 1. Put positive rectifier (1) in place. 2. Put in three insulating bushings (2). 3. Put in screw (3), lockwasher (4), flat washer (5), and one insulating washer (6). 4. Put in terminal board (7) and capacitor (8) and put in two screws (9), lockwashers (10), and other insulating washer (6). GO TO FRAME 5 ● TA 103643 2-143