TM-9-2815-202-34 Technical Manual for 8V71T Engines for M109 Howitzer Download
Page 84 of 670
TM 9-2815-202-34 Section IV. REMOVAL/lNSTALLATION PRIOR TO INSTALLATION OF ENGINE 3-6. OIL COOLER REMOVAL/lNSTALLATION OF ENGINE ACCESSORIES ONTO MAINTENANCE STAND This task covers: a. Removal b. Installation INITIAL SETUP MODELS MANDATORY REPLACEMENT PARTS ■ All 1 Gasket (App F ltem 53) 2 Gasket (App F, ltem 35) 12 Lockwashers (App F, ltem 93) TOOLS AND SPECIAL TOOLS PERSONNEL REQUIRED: 2 General mechanics tool kit (App B, Item 96) Guide studs (App D, Item 3) Torque wrench (App B, Item 101) a. Removal (1) Loosen two clamps (1)securing hose (2)to tube (3)and water pump outlet. (2) Remove four bolts (4) and four lockwashers (5)securing tube (3)to oil cooler (6). Discard Iockwashers. (3) Remove tube (3), hose (2), and gasket (7). Discard gasket. (4) Clean and remove all traces of gasket material from tube and oil cooler. 3-30 Change 1