TM-9-2815-202-34 Technical Manual for 8V71T Engines for M109 Howitzer Download
Page 81 of 670
TM 9-2815-202-34 3-5. PREPARATION OF ENGINE PRIOR TO REMOVAL OF ENGINE ACCESSORIES AND INSTALLATION ON MAINTENANCE STAND This task covers: a. Preparation b. Inspection INITIAL SETUP MODELS EXPENDABLE/DURABLE SUPPLIES All Tape (App C, Item 27) Cleaning solvent (App C, Item 10) TOOLS AND SPECIAL TOOLS General mechanics tool kit (App B, Item 96) Three-legged sling (App B, Item 84) Four-legged sling (App B, Item 82) a. Preparation for Removal of Accessories WARNING Never crawl under equipment when performing maintenance unless equipment is securely blocked. Keep clear of equipment when it is being raised or lowered. Do not allow heavy components to swing while suspended by lifting device. Exercise extreme caution when working near a cable or chain under tension. Equipment may drop or shift and injury to personnel may result. ● ● (1) NOTE Use the three-legged sling to lift engine models 7083-7395 and 7083-7398. Use four-legged sling to lift engine models 7083-7391, 7083-7396, and 7083-7399. Lift engine assembly for cleaning, draining, and installation on maintenance stand by using multi-leg sling (1) attached to engine lifting brackets (2). Use a hoist having a minimum lifting capacity of 1.5 tons (1.36 metric tons). Change 1 3-27