TM-9-2815-202-34 Technical Manual for 8V71T Engines for M109 Howitzer Download
Page 157 of 670
TM 9-2815-202-34 (3) lnsert drive shaft (11)through blower drive gear(15). lf binding occurs, refer to blower alinement procedure in para 4-18. (4) Install snap ring (12) in blower drive hub (18). Remove 10-32 x 1- inch bolt (10 ) from shaft (11). (5) Install blower drive cover (7) and gasket (9) on flywheel housing (8) and secure with two bolts (1) and two Iockwashers (6). (6) Install bolt (1), two bolts (2), bolt (3), two Iockwashers (6), flat washer (5), and nut (4) in remaining holes. (7) Torque bolt (3) and nut (4) to 35-39 Ib-ft (47-53 N-m). Torque five remaining bolts to 30-35 Ib-ft (41-47 N-m). END OF TASK FOLLOW-ON MAINTENANCE Para Description 4-2 Turbocharger installed (7083-7395) 6-3 Turbocharger installed (7083-7398) Change 1 4-55