TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download
Page 209 of 323
PAR 227 STEPS 55-58 ASSEMBLY CHAP 5, SEC XXXlll Figure 294 (Step 55) Install twenty-seven 7/16-14 x 1-1/2 (A), and four 7/16-14 x 7-1/2 (B) bolts with lock wash- ers. Install lifting bracket (C) and three 7/16- 14 x 1-3/4 bolts (D) with lock washers. Us- ing a 5/8-inch wrench, torque all bolts to 42-50 pound-feet. Figure 295 (Step 56) Install accumulator body (A) and gasket (B). Secure body with four 3/8-16 x 1-1/2-inch (C) and two 3/8-16 x 2-1/2 bolts (D) and six wash- ers (E). Using a 9/16-inch wrench, torque all bolts to 26-32 pound-feet. Figure 296 (Step 57) Make a preliminary brake assembly adjust- ment at this time. Insert gage (A) between rotating cam and first plate. Turn brake ad- justing nut (B) clockwise, until brake plate clearance equals the gage thickness. Adjust the left-brake assembly clearance in the same manner. Figure 297 (Step 58) Using wrench (A), apply the right brake. Us- ing a 1-inch wrench, tighten right-output coupling bolt (B) to 337-385 pound-feet torque. 177