TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download

Page 204 of 323

*C2 CHAP 5, SEC XXXIII ASSEMBLY PAR 227, STEPS 35-38 Figure 274 (Step 35) Install brake anchor assembly (A). Install sixteen 7/16- 14x 7-1/2 bolts (B) and one 7/16- 14 x 7 bolt (D). Remove guide bolt (C) and install remaining 7/16- 14 x 7 bolt (D). Using a 5/8-inch wrench, torque the eighteen bolts to 42-50 pound-feet. Figure 276 (Step 37) Raise the transmission housing (A) and install 3/4-16 self-locking bolt (B) and lock plate (C) into the end of the steer planetary carrier and shaft assembly. Tighten bolt only finger-tight at this time. Figure 275 (Step 36) Using hoist and sling (A), install the geared steer planetary carrier and shaft assembly (B). Remove the sling and tap the assembly down while rotating it. 172 Figure 277 (Step 38) Position the transmission housing on its bot- tom. Install 10 external- (A) and 10 internal- splined (B) left-brake plates alternately, be- ginning with an external-splined plate (A).