TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download
Page 195 of 323
PAR 226-227 ASSEMBLY CHAP 5, SEC XX XIII 226. ASSEMBLY Note. Press o n the extreme outer —— diameter of seal 46 when installing ~. Left-output Shaft Assembly into retainer 41. Install packing 45, —.> seal 46, spacer 44 amd retainer 4:1 as (1) Install preformed packing 45 (fig. a unit onto oc tjjut shaft assembly 47. 385, fold-o~t 14) into spacer 44. (4) Install roller bearing 39 clnto shaft assembly 47, pressing the bearing until it is (2) Using an oil S e a 1 feplacer and a flrml~ ;Seated. press, install the seal onto the output shaft spacer (fig. 239). Q. Right-output Shaft Assemt~. The left- and-right-o~t=~~~ ssernblies a r e (3) Install preformed packing 45 (fig. ickmtical, therefore the assembly procedure 385, fold-out 14) and spacer 44 with seal 46 is the same as described in ~(l) thrc)ugh 2(4), into retainer 41. above. #c4? Section XXXIII. ASSEMBLY OF POWER TRAIN FROM SUBASSEMBLIES 227. ASSEMBLY STEPS – MAIN TRANSMISSION ASSEMBLY — &— Note. The following assembly steps for the XTG-411 -2A power train are to be used in the same manner as the disassembly steps, Refer to par, 73~ and b. — Figure 240 (Step 1) Install turbine shaft assembly (A) into main transmission housing (B). Figure 241 (Step 2) Using sling (A), .:aise the transmission hous- ing (B:), holding onto the turbine shaft (C). Block t h e housing h i g h enough fcu’ turbine shaft to clear the assembly table. Then block under the turbinf shaft. 163 .——