TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download
Page 185 of 323
*C2 *C2 *C2 PAR 195-196 INTERMEDIATE PLANETARY, LOW RING GEAR REBUILD CHAP 5, SEC XXVI Figure 224. Removing spindle lock pin and repair recommendations. Repair and re- build points of measurement for fits, clear- ances and wear limits are indicated by small, lower case letters in fig. 376, fold-out 5. Refer to par. 239 for wear limits information. 196. ASSEMBLY (fig. 376, fold-out 5) Note. Chill spindles 19 in dry ice for approximately one hour, prior to installation. a. Place intermediate-range planetary carrier, long-splined end down, in a press (fig. 226). b. Grease the inside diameter of plane- tary carrier pinion 22, fig. 376, fold-out 5. c. Insert 22 spindle rollers 23 into the pinion bore. Refer to fig. 215. e. Insert alining tool 8351208 through the pinion. Figure 225. Removing intermediate-range planetary carrier spindle Figure 226. Installing intermediate-range planetary carrier spindle 153