TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download
Page 163 of 323
PAR 153 REAR HOUSING REBUILD CHAP 5, SEC XVIII Figure 178. Removing right-cam follower link assembly shaft Figure 179. Removing (or installing) left-cam follower and brake apply link assembly q. Remove pin 9, bearing 12 and brake apply link 11 from cam follower link 3. r. Remove the left-brake apply cam ro- tating ring 19 (fig. 378, fold-out 7) and 12 balls 27. Remove ring seal 26 and expander 25 from cam ring 19 only if replacement is necessary. s. Remove set screw (fig. 179). Figure 180. Removing (or installing) right-cam follower and brake apply link assembly Figure 181. Removing brake apply shaft retainer and gasket t. Remove the right-cam follower and brake apply link assembly (fig. 180). u. Remove retaining ring 67 (fig. 379, fold-out 8) that retains pin 59 in right-cam follower link 60. v. Remove pin 59, cam follower 62, bear- ing rollers 63 and washers 61 and 64 from cam follower link 60. w. Remove retaining ring 68 that retains brake apply link pin 58. x. Remove pin 58, bearing 70 and brake apply link 71 from cam follower link 60. y. Remove right-brake apply rotating cam ring 13 (fig. 380, fold-out 9) and 12 balls 131