*C2 CHAP 5, SEC IV. TORQUE CONVERTER REBUILD PAR 83 b. Torque Converter Pump (1) Straighten the tabs of lock strips on the converter pump hub (fig. 145). (2) Using a 7/16-inch wrench, remove eight self-locking bolts and four lock strips retaining the torque converter pump hub in the converter pump. Remove the hub. (3) Remove two hook-type seal rings 87 (fig. 373, fold-out 2) from pump nub 88. (4) Remove retaining ring 92 retaining bearing 91 in converter pump hub 88. Press the bearing from the hub. c. Torque Converter Turbine (1) Do not remove the ball bearing from the turbine assembly, unless replacement is necessary (fig. 146). Figure 145. Straightening corners of converter pump hub lock strip (2) If necessary to remove the bearing, pry it from the turbine hub. d. Torque Converter Stator (1) Rotating the stator freewheel race in a clockwise direction, remove it from the stator assembly (fig. 147). Figure 146. Torque converter turbine assembly Figure 147. Removing stator freewheel race and thrust bearing assembly from stator 106