TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download
Page 132 of 323
CHAP 5, SEC II DISASSEMBLY 76. Figure 127 (Step 63) Remove pitot tube assembly (A). Figure 128 (Step 64) Using sling (A), lift the transmission housing and remove converter turbine shaft assembly (B). Position the transmission housing on its bottom side. PAR 75-76 DISASSEMBLY STEPS – LEFT- AND RIGHT-OUTPUT DRIVE ASSEMBLIES Note. The left- and right-output drive assemblies are identical with the ex- ception of the length of two compon- ents. The left-input shaft and left- saddle assembly are longer than the corresponding components of the right-output drive assembly. The disassembly procedures are the same for both assemblies. With the excep- tion of Step 2, the following illustra- tions show the disassembly proce- dures for the right-output drive as- sembly. Step 2 illustrates the left- output drive assembly, and shows the difference in size of the input shafts and saddle assemblies of the right- and left-output assemblies. Figure 129 (Step 1) Using a 9/16-inch wrench, remove six bolts (A) and lock washers. Remove output drive coupling cap (B). Remove seal (C) from cap (B). Remove alinement ring (D) and input shaft (E). 100