TM-9-2520-234-35 Technical Manual for M109 Transmission XTG-411-2A Download

Page 126 of 323

CHAP 5, SEC II DISASSEMBLY PAR 75, STEPS 39-42 Figure 103 (Step 39) Using sling (A), position transmission main housing on disassembly table, blocking as- sembly so turbine shaft (B) clears the table. Figure 104 (Step 40) Using hoist and sling (A), remove the left- brake hub and steer planetary assembly (B). Using a 5/8-inch wrench, remove 18 bolts (C) from left-brake anchor (D). 94 Figure 105 (Step 41) Remove left-brake anchor assembly (A), Figure 106 (Step 42) Using three 7/16-14-inch bolts (A), attach sling (B) to left-clutch reaction plate assembly (C). Remove the reaction plate assembly.