TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 83 of 343

TM 9-2350-358-BD 3-29. LINKAGE RETAINING DEVICES - CONTINUED Option 3 Limitations: None Personnel/Time Required: 1 soldier 0.2 hour Materials/Tools: Bolt or nail (scavenge from available source) Procedural Steps: 1. Place bolt or nail through hole. 2. Bend (nail) or peen (bolt) end of nail or bolt. 3. Record BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 4 Limitations: None Personnel/Time Required: 1 soldier 0.2 hour Materials/Tools: Bolt or nail (scavenge from available source) Procedural Steps: NOTE Following option is for replacing alignment pins or dowels. 1. Select bolt or nail that will fit tight in hole. 2. Tap bolt or nail into the hole. 3. Cut bolt or nail to proper length. 4. Record BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. 3-38