TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download
Page 63 of 343
TM 9-2350-358-BD 3-13. SHIELDED CABLES, DAMAGED - CONTINUED 10. Install permanent splice/barrel of a terminal lug over ends of severed inner conductor. 11. Insulate permanent splice from shielding with electrical tape. 12. Strip other end of small insulated wire and splice into second ground sheath connector, ensuring contact is made with shielding. 13. Crimp second ground sheath connector. 14. Slide insulation sleeve over entire spice. 15. Heat insulation sleeve or tie both ends of flexible tubing. 16. Record BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 3 Limitations: RFI may be induced. Personnel/Time Required: • 1 soldier • 0.5 hour Materials/Tools: • Connector, splice, three required (item 10, Appendix C) • Crimping tool, terminal (found in M2/3 generic BDR kit, Section III, Appendix C) 3-18