TM 9-2350-358-BD 3-12. HEAVY DUTY CABLES, BROKEN - CONTINUED Option 3 Limitations: None Personnel/Time Required: 1 soldier 0.4 hour Materials/Tools: Tape, insulation, electrical (item 63 Appendix C) or insulation sleeving, electrical (item 34, Appendix C) Procedural Steps: 1. Turn off MASTER power switch. 2. Remove 2 inches of insulation from each end of broken wire. 3. Split ends of cable into manageable strands. 4. Join two ends by twisting corresponding strands together. 5. Bend twisted end parallel to cable and insulate with tape. 6. Record BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 4 Limitations: None Personnel/Time Required: 1 soldier 1.5 hour Materials/Tools: Tape, insulation, electrical (item 63, Appendix C) 3-14