TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 54 of 343

TM 9-2350-358-BD 3-10. WIRES, BROKEN - CONTINUED Option 1 Limitations: None Personnel/Time Required: 1 soldier Time determined by location and amount of damage Materials/Tools: Crimping tool, terminal (found in M2/3 generic BDR kit, Section III, Appendix C) Insulation sleeving, electrical (item 37, Appendix C) Solder, lead-tin alloy (item 58, Appendix C) Tape, insulation, electrical (item 63, Appendix C) Procedural Steps: 1. Strip end of broken wires. 2. Install a section of insulation sleeving over one end of broken wire. 3. Lay stripped ends side by side. 4. Twist wire ends together. 5. Solder wires together using lead-tin alloy solder. 6. Insulate by sliding sleeve over soldered wires and crimp or wrap tape around soldered wires. 7. Record BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 2 Limitations: None Personnel/Time Required: 1 soldier Time determined by location and amount of damage. 3-9