TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 43 of 343

TM 9-2350-358-BD CAB DAMAGE ASSESSMENT AND REPAIR - CONTINUED Serial No.______________ COLUMN 3 Hydraulic System Time Personnel 1. Lines and Fittings _______ ________ 2. Fuzes and Manifold _______ ________ 3. Gunner’s Control Handle _______ ________ 4. COS Control Handle _______ ________ 5. Equilibration Manifold _______ ________ 6. Equilibration Hand Pump _______ ________ 7. Elevation Equilibration Acumulator _______ ________ 8. Mode Selector Valve _______ ________ 9. Elevation Mechanism _______ ________ 10. Hydraulic Powerpack _______ ________ 11. Tranverse Servovalve _______ ________ 12. Tranverse Motor _______ ________ 13. Hydraulic Clutch Valve _______ ________ 14. Tranverse Limit Valve _______ ________ 15. Elevation Selector Valve _______ ________ 16. Manual Elevation Hand Pump _______ ________ 17. Manual Elevation Pump Accumulator _______ ________ 18. Hydraulic Fluid Filter Assembly _______ ________ 19. Traverse Selector Valve _______ ________ 20. ___________________ _______ ________ 21. ___________________ _______ ________ Total _______ ________ COLUMN 4 Traverse Mechanism Time Personnel 1. Traverse Mechanism Assembly _______ ________ 2. Traverse Lock Assembly _______ ________ Total _______ ________ Communications Time Personnel 1. Intercom Audio Amplifier Connectors ________ 2. Intercom Control Boxes _______ ________ 3. Antennas and Mounts _______ ________ 4. Radio and Mount _______ ________ 5. Wiring Harnesses _______ ________ 6. ___________________ _______ ________ 7. ___________________ _______ ________ Total _______ ________ Total Assessement Time Personnel Column 1 _______ ________ Column 2 _______ ________ Column 3 _______ ________ Column 4 _______ ________ Total _______ ________ Remarks 2-20