TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 42 of 343

TM 9-2350-358-BD CAB DAMAGE ASSESSMENT AND REPAIR - CONTINUED Serial No.______________ COLUMN 1 Cannon and Mount Time Personnel 1. Barrel Assembly _______ ________ 2. Breech Mechanism _______ ________ 3. Gun Mount _______ ________ 4. ___________________ _______ ________ 5. ___________________ _______ ________ Total _______ ________ Electrical System Time Personnel 1. Circuit Breakers _______ ________ 2. Wiring Harness/Leads _______ ________ 3. Relays _______ ________ 4. Slip Ring _______ ________ 5. Brush Blocks _______ ________ 6. Hydraulic Compartment Fan _______ ________ 7. Hydraulic Pump Motor _______ ________ 8. Hydraulic Control Box _______ ________ 9. Transverse Limit Switch _______ ________ 10. ___________________ _______ ________ 11. ___________________ _______ ________ Total _______ ________ Loader Rammer Time Personnel 1. Loader Rammer Assembly _______ ________ 2. Control Valve _______ ________ 3. ___________________ _______ ________ 4. ___________________ _______ ________ Total _______ ________ Sighting Equipment Time Personnel 1. M145 Linkage Assembly _______ ________ 2. Connecting Link Assembly _______ ________ 3. Telescope Cover _______ ________ 4. M145 Alignment Device Mount _______ ________ 5. ___________________ _______ ________ 6. ___________________ _______ ________ Total _______ ________ COLUMN 2 Automatic Fire Control System Time Personnel 1. Wiring Harnesses _______ ________ 2. Control Unit _______ ________ 3. Display Unit _______ ________ 4. Power Conditioner Unit _______ ________ 5. Communication Processor _______ ________ 6. Ballistic Computer/ Weapons Controller _______ ________ 7. Backup Batteries _______ ________ 8. Azimuth Tachometer _______ ________ 9. Elevation Tachometer _______ ________ 10. Tube Temperature Sensor _______ ________ 11. Hull Naviation Components _______ ________ 12. Cab Naviation Components _______ ________ 13. ___________________ _______ ________ 14. ___________________ _______ ________ Total _______ ________ Microclimate Conditioning System Time Personnel 1. Air Duct, Hoses, and Connectors _______ ________ 2. Control Panel _______ ________ 3. M3 Heaters _______ ________ 4. MCS Pack Components _______ ________ 5. Wiring Harnessess/Leads _______ ________ 6. ___________________ _______ ________ 7. ___________________ _______ ________ Total _______ ________ 2-19