TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 254 of 343

TM 9-2350-358-BD 12-2. ASSESSMENT PROCEDURE - CONTINUED Table 12-2. Cannon and Mount Visual Assessment ATTEMPT OPERATION INOPERATIVE: Replenisher accumulator ............................................ para 12-5 Gun tube ..................................................................... para 12-6 Bore evacuator ............................................................ para 12-7 Sighting equipment ..................................................... para 12-9 Traverse mechanism .................................................. para 12-12 Determine if: No problem found Damage can be repaired Damage cannot be repaired - Note repair requirements - Note extent of damage repair requirements Go to Table 2-3 Evaluation of Performance Capability Operation observation is complete. Return to Table 2-2 to continue operation assessment. 12-3. REPAIR PROCEDURE INDEX PARA Replenisher accumulator, damaged .................................................................................................. 12-5 Gun tube interchange ability............................................................................................................... 12-6 Bore evacuator, damaged .................................................................................................................. 12-7 Sighting equipment damaged............................................................................................................. 12-9 Composite armor, penetrated ............................................................................................................ 12-11 12-2