TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 243 of 343

TM 9-2350-358-BD 11-13. HYDRAULIC TUBE AND HOSE ISOLATION - CONTINUED Personnel/Time Required: 1 soldier 0.2-0.5 hour References: TM 9-2350-314-20-2-2 1. Remove broken tube, if necessary. 2. Flatten about 6 inches of tubing near break. 3 Fold flattened portion of tube over twice. 4 Install repaired tube if removed. 5 Record the BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 5: Low pressure line repair (tube isolation) using bolt. Limitations: Not recommended for pressure over 70 psi. Personnel/Time Required: 1 soldier 0.2-0.5 hour Materials/Tools: Sealing compound (found in M2/3 generic BDR kit, Section III, Appendix C) Hexagon head bolt (scavenge from available source) Pressure sensitive adhesive tape (found in M2/3 generic BDR kit, Section III, Appendix C) Clamp (found in M2/3 generic BDR kit, Section III, Appendix C) 11-25