TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download
Page 240 of 343
TM 9-2350-358-BD 11-13. HYDRAULIC TUBE AND HOSE ISOLATION - CONTINUED 3. Flare other end of tubing if possible and remove burrs. Apply light coat of sealing compound around flared end of tube. 4. Slide flared end of tube inside hose and secure with clamp. 5. Record the BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 2: High-pressure line repair (tube isolation) using plugs. Limitations: None Personnel/Time Required: • 1 soldier • 0.2-1.0 hour Materials/Tools: • Tube pipe fitting kit (found in M2/3 generic BDR kit, Section IIl, Appendix C) • Sealing compound (found in M2/3 generic BDR kit, Section III, Appendix C) References: TM 9-2350-314-20-2-2 Procedural Steps: 1. Remove broken tube from bulkhead adapter. 11-22