TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download
Page 219 of 343
TM 9-2350-358-BD CHAPTER 11 HYDRAULIC SYSTEM BDAR FIXES SHALL BE USED ONLY IN COMBAT OR FOR TRAINING AT THE DISCRETION OF THE COMMANDER. (AUTHORIZED TRAINING FIXES ARE LISTED IN APPENDIX E.) IN EITHER CASE, DAMAGES SHALL BE REPAIRED BY STANDARD MAINTENANCE PROCEDURES AS SOON AS PRACTICABLE. SECTION I. INTRODUCTION 11-1. SCOPE This chapter contains fault assessment and expedient repair procedures available to find and fix battlefield damage to the hydraulic system. 11-2. ASSESSMENT PROCEDURE Table 11-1. Hydraulic System Visual Assessment No specific assessment procedures are needed to locate leaks and ruptured lines. System specific TM must be checked before any isolation is performed. VISUALLY INSPECT DAMAGE FOUND TO: Preformed packing ...................................................... para 11-7 Hydraulic tube and hose repair (low pressure) ............................................................. para 11-10 Hydraulic tube and hose repair (high pressure) ............................................................ para 11-11 Hydraulic fuze manifold ............................................... para 11-15 Determine if: No damage found Damage can be repaired Damage cannot be repaired - Note repair requirements - Note extent of damage repair requirements Go to Table 2-3 Evaluation of Performance Capability Visual inspection is complete. Return to Table 2-1 to continue visual assessment. 11-1