TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download
Page 218 of 343
TM 9-2350-358-BD 10-19. TRACK DAMAGE, SHORT TRACKING - CONTINUED Personnel/Time Required: • 2 soldiers • 2.0-3.0 hours References: TM 9-2350-314-20-1-2 Procedural Steps: 1. Remove damaged suspension components. 2. Remove a sufficient number of track blocks so that the track may be reconnected over the remaining roadwheels and drive sprocket. 3. Record the BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. 10-20