TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download
Page 162 of 343
TM 9-2350-358-BD 7-2. ASSESSMENT PROCEDURE - CONTINUED Table 7-1. Electrical System Visual Assessment - Continued VISUALLY INSPECT DAMAGE FOUND TO: Determine if: No damage found Damage can be repaired Damage cannot be repaired - Note repair requirements - Note extent of damage repair requirements Go to Table 2-3 Evaluation of Performance Capability Visual inspection is complete. Return to Table 2-1 to continue visual assessment Table 7-2. Electrical System Operation Assessment ATTEMPT OPERATION INOPERATIVE: Motor, starter ................................................. para 7-5 Batteries ...................................................... Chapter 3 Starter switch ................................................ para 7-6 Brush, electrical, motor/generator worm ....... para 7-7 Cables ......................................................... Chapter 3 Wiring. ......................................................... Chapter 3 Circuit breakers ........................................... Chapter 3 Switch, relay, oil pressure activated, air cleaner and generator system ................. para 7-9 Switch, master ............................................ para 7-10 Switch, neutral, safety ................................. para 7-11 Relay, master .............................................. para 7-12 Relay, starter protection .............................. para 7-13 Relay, generator/fuel pumps ....................... para 7-14 Relay, hydraulic pump motor ....................... para 7-15 Overload sensor, hydraulic pump motor ................................. para 7-16 Determine If No problem found Damage can be repaired Damage cannot be repaired - Note repair requirements - Note extent of damage repair requirements Go to Table 2-3 Evaluation of Operation observation Is complete. Return Performance Capability to Table 2-2 to continue visual assessment 7-2