TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 154 of 343

TM 9-2350-358-BD 6-11. HOSE LEAKAGE - CONTINUED Option 3: Joint, Leak. Limitations: None Personnel/Time Required: 1 soldier 1.0 hour Materials/Tools: Patch, tire repair kit (found in M2/3 generic BDR kit, Section III, Appendix C) Tape, duct (item 62, Appendix C) References: TM 9-2350-314-10 TM 9-2350-314-20-1-1 Procedural Steps: 1. Gain access to leak. 2. Clean area around leak. 3. Wrap the area with tape. 4. Record the BDAR action taken. When mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. Option 4 Limitations: Reduced mobility Personnel/Time Required: 1 soldier 0.5 hour Materials/Tools: Tape, duct (item 62, Appendix C) Thin sheet metal (scavenge from available source) Sealer, permatex (item 54, Appendix C) Clamp, hose (item 7, Appendix C) 6-16