TM-9-2350-358-BD M109A6 Battlefield Damage Assessment and Repair Download

Page 101 of 343

TM 9-2350-358-BD 4-7. THROTTLE LINKAGE BROKEN - CONTINUED Procedural Steps: 1 Gain access to engine compartment through air-intake grille. 2 Locate and remove damaged section of the engine throttle governor control rod. 3 Disconnect fuel shut-off cable and reconnect at governor control lever. 4 Record the BDAR action taken. When the mission is complete, as soon as practical, repair the equipment/system using standard maintenance procedures. 4-9