TM-9-2350-311-34-2 Maintenance Manual for Volume 2 M109 Cab Download

Page 119 of 552

TM 9-2350-311-34-2 CONTINUED FROM STEP E Check nitrogen pressure in primary accumulator assemblv (TM 9-2350-311-20-2). I Is pressure between 850 to 900 psi (5861 to 6206 kPa)? I Charge primary accumula- tor assembly (TM 9-2350- 311-20-2). If charge does not hold, repair or replace primary accumulator as- sembly (para 6-8). Check nitrogen pressure in secondary accumulator Is pressure between 1450 to 1550 psi (9998 to 10687 kPa)? I I Charge secondary accumu lator assembly (TM 9- 2350-311-20-2). If charge does not hold, repair or re- place secondary accumula- tor assembly (para 6-9). Replace safety relief eleva- tion valve assembly (para 6-12). ASSEMBLY I \ AFETY RELIEF EVATION VALVE ASSEMBLY ------a I PRIMARY ACCUMULATOR ASSEMBLY END OF TASK Change 2 2-53