TM-9-2350-311-34-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 268 of 352

TM 9-2350-311-34-1 10-1 WINTERIZATION KIT INSTALLATION — CONTINUED a. Installation — Continued 18 19 20 21 22 23 24 Place coolant heater assembly (33) on two coolant heater mounting brackets (20) and clamp with four retaining bands (38) and four screws (39). Install four retaining bands (38), two screws (40), two Iockwashers (41), and two nuts (42). Install exhaust tube end support bracket (43), three flat washers (44), and three screws (45) to three hull front plate tapping blocks. Close transmission access door to position exhaust tube end. Open door and tighten screws. Install gasket (46). Place clamp (47) on free end of 16-in. (40.6-cm) hose (28), install hose on coolant heater outlet elbow (32), and tighten clamp. Remove heater exhaust cover (48), three screws (49), and three flat washers (50) from inside left transmission access door (51). Lift cover and gasket (52) from outside surface of door. Install exhaust outlet (53) to left transmission access door (51) and install three screws (49), three flat washers (50), and gasket (52). Install exhaust outlet plug (54) in exhaust outlet (53). 10-8