TM-9-2350-311-34-1 Maintenance Manual for Volume 1 M109 Hull Download
Page 266 of 352
10-6 TM 9-2350-311-34-1 10-1 WINTERIZATION KIT INSTALLATION — CONTINUED a Installation — Continued 10 11 12 13 Place four batteries on two battery trays with battery terminals positioned as shown below. Secure batteries using mounting components (TM 9-2350-311-20-1). Open transmission left and right access doors and air-intake grille. Install four shock mounts (19) and two coolant heater mounting brackets (20) to hull front plate (21) with four lockwashers (22) and four nuts (23). Cut 3.5 in. (8.9 cm) out of existing engine inlet coolant hose (24) at point midway between two coolant heater mounting brackets (20). Discard hose section. Place two clamps (25) over two hose ends, insert “Y” tube (26) as shown below, and tighten clamps. Place hose clamp (27) over end of 0.625-in. - (15.9-mm-) id by 16-in. - (40.6-cm-) long hose (28). Install hose to "Y" tube (26) and tighten clamp .