TM-9-2350-311-34-1 Maintenance Manual for Volume 1 M109 Hull Download

Page 264 of 352

TM 9-2350-311-34-1 10-1 WINTERIZATION KIT INSTALLATION — CONTINUED a. Installation — Continued NOTE Ensure bottom insulation cut-outs are alined with battery tray mounting blocks. 4 Fold up rear battery winterization box (6). Insert through front battery access opening (5) and locate box in rear battery access opening (4). NOTE Ensure box bottom cut-outs are alined with battery tray mounting blocks. Screw and Iockwasher were removed in step 1. 5 Attach front ground cable (7) to hull front plate with screw (8) and Iockwasher (9). 6 Unfold sides of front and rear winterization boxes (3 and 6) and insert six retainer wires (10) at comers. 7 Secure six straps (11) to rivets (12) with Iockwire (13). 8 Place grommets (14) (hidden) on battery heater (15) inlet and outlet tubes and install heater through front battery access opening (5). Insert tube grommets in front winterization box (3) cut-outs. NOTE Screw and Iockwashers were removed in step 1. Four screws and 16 flat washers are provided for shimming adjustment of tray to make it level. Use of shims should be kept to minimum. 9 Install battery trays (16) and attach trays and battery heater (15) to sponsor with eight furnished screws (1 7) and eight Iockwashers (18). 10-4