TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 64 of 828
TM 9–2350–311–20–2 2–3 Section II. SERVICE UPON RECEIPT 2–4 SERVICE UPON RECEIPT OF MATERIAL 2–4.1 Unpacking a. Removal of Closure Kit 1 Loosen side rope (1) (two on each side). 2 Remove tie-down ropes at rear of vehicle. 3 Remove corner ropes at rear of vehicle. 4 Untie front corner ropes (2). 5 Remove vehicle front ropes. 6 Unlace ropes from front eyelets. 7 Unlace ropes from eyelets on front covers. 8 Remove guide ropes from side wire struts. 9 Remove all ropes from eyelets. 2 1