TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download

Page 609 of 828

TM 9–2350–311–20–2 Change 2 15–5 d. Installation 1 Apply sealing compound to threads of machine bolt (6). 2 Install machine bolt (6) on post (5). 3 Insert the end of wire rope (7) into nearest machine bolt (6) on post (5). Make a loop at the end of the wire rope and crimp new wire swaging sleeve (10 or 19) onto wire rope at base of loop. Tighten machine bolt to post. 4 Insert free end of wire rope (7) into hole on retainer assembly (8). Make a loop at the end of the wire rope and crimp new wire swaging sleeve (10 or 19) onto wire rope at base of loop. 5 Install retainer assembly (8) on projectile stowage rack assembly (9). 6 Install two quick-release plungers (4), two locking caps (2 or 3), and two shoulder screws (1) on two nearest posts (5). This will secure retainer assembly (8) on projectile stowage rack assembly (9). Torque shoulder screws to 15–20 ft–lb (20–27 N . m). Adjust quick-release plungers until contact is made with locking caps. 1 5 2 7 6 4 1 3 4 8 9 5 10 19 10 19