TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 587 of 828
TM 9–2350–311–20–2 14–23 NOTE Bustle doors must be open, unless removed, for installation of strike assemblies. 3 Aline screw holes on two bottom strike assemblies (7) with screw holes on bottom of bustle door assemblies (left and right) (4). Install new shim(s) (6) (if required) and two strike assemblies (7), using eight socket head cap screws (5). 4 Aline screw holes on two top strike assemblies (3) with screw holes on top of bustle door assemblies (left and right) (4). Install two top strike assemblies using six new lockwashers (2) and six cap screws (1). 7 6 4 5 3 2 1