TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download

Page 489 of 828

TM 9–2350–311–20–2 8–65 5 Using hex nut (33) and new lockwasher (34), install terminal connecting link (37) on post (35) of circuit breaker (36). 6 Slide conductor bus (46) onto electromagnetic relay (31) and tighten hex nut (45) on relay load terminal post. 7 Position new gasket (32) over screw holes and insert connector (23) with attached electrical lead (30) into cab power relay box assembly (1). Install four machine screws (20) and four new lockwashers (21) on con- nector (23). Using hex nut (28) and new lockwasher (29), install electrical lead (30) on electromagnetic relay (31). 8 Position new gasket (27) over screw holes and insert connector (22) into cab power relay box assembly (2), and secure with four new lockwashers (21) and four machine screws (20). Aline connector (22) with prongs of terminal connecting link (37) and conductor bus (46). Install flat washer (26), new lockwasher (25), and hex nut (24). 9 Install new gasket (19), connector (14), four new lockwashers (13), and four machine screws (12). Aline connector (14) with prong of terminal connecting link (37) inside cab power relay box assembly (2). Connect connector (14) to terminal connecting link (37) using two flat washers (18), new lockwasher (17), and hex nut (16). 10 Install new gasket (19), connector (14), four new lockwashers (13), and four machine screws (12). Aline connector (15) with prong of conductor bus (46) inside cab power relay box assembly (2). Connect connec- tor (15) to conductor bus (46) using two flat washers (18), new lockwasher (17), and hex nut (16). 30 28 31 26 25 24 19 16 17 18 15 13 12 23 30 32 27 21 22 20 19 16 17 18 14 13 12 29 2