TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 484 of 828
TM 9–2350–311–20–2 8–60 Change 2 8–13 POWER RELAY BOX ASSEMBLY This task covers: a. Removal b. Disassembly c. Assembly d. Installation INITIAL SETUP Tools Artillery and turret mechanic’s tool kit (SC 5180–95–CL–A12) Materials/Parts Gasket (item 101, Appx G) Gasket (item 102, Appx G) Gasket (item 179, Appx G) Gaskets (2) (item 103, Appx G) Lockwasher (item 55, Appx G) Lockwashers (8) (item 53, Appx G) Lockwashers (4) (item 54, Appx G) Lockwashers (2) (item 56, Appx G) Lockwashers (5) (item 64, Appx G) Lockwashers (8) (item 76, Appx G) Lockwashers (6) (item 78, Appx G) Lockwashers (2) (item 87, Appx G) Equipment Condition Disconnect batteries (TM 9–2350–311–20–1) NBC power switch box removed on M109A4/M109A5 howitzers (para 17–4) POWER RELAY BOX ASSEMBLY WIRE 100 WIRE 148 WIRE 645 WIRE 104