TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 483 of 828
TM 9–2350–311–20–2 8–59 d. Testing Using multimeter, test electrical circuit for continuity. e. Installation 26 Aline four screw holes on box mount (5) with screw holes on gunner’s selector switch box assembly (2). 27 Install four flat washers (4) and four cap screws (3). 28 Connect J2 connector harness (1), wire 100, to gunner’s selector switch box assembly (2). 4 3 5 1 2 13 14 15 16 18 19 21 20 17 10 9 8 6 7 12 11 2