TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 471 of 828
TM 9–2350–311–20–2 8–47 Section II. COMPONENT MAINTENANCE 8–11 DOME LIGHT ASSEMBLIES This task covers: a. Removal b. Disassembly c. Assembly d. Installation INITIAL SETUP Tools Artillery and turret mechanic’s tool kit (SC 5180–95–CL–A12) Materials/Parts Gasket (item 174, Appx G) Gasket (item 168, Appx G) Lockwashers (5) (item 61, Appx G) Preformed packing (item 177, Appx G) Seal (item 176, Appx G) Seal (item 178, Appx G) Equipment Condition Disconnect batteries (TM 9–2350–311–10) a. Removal WARNING Make sure that CAB POWER and MASTER switches are fully operational. Turn them off when work- ing on cab electrical components. Failure to observe this warning could result in injury or death. 1 Disconnect wire 138, from connector (1) on dome light assembly (2). 2 Remove four cap screws (3), four flat washers (4), and dome light assembly (2). 1 3 4 2