TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download

Page 468 of 828

TM 9–2350–311–20–2 8–44 8–9 NBC POWER LEAD ASSEMBLY — CONTINUED b. Disassembly/Assembly See repair procedures for harness, plugs, and terminals (para 8–1). c. Testing Using multimeter, test NBC power lead assembly (9) for continuity through all terminals and connectors. d. Installation 1 Carefully route wires of NBC power lead assembly (9) through mounting hardware of their respective hoses. 2 Connect connector (3), wire 135, to M2A2 air purifier (4) and connector (1) to NBC control box assembly (2). 3 Connect connector (8), wire 136D, to section chief’s M3 electrical air heater. 4 Connect connector (7), wire 136C, to assistant gunner’s M3 electrical air heater. 5 Connect connector (6), wire 136B, to cannoneer no. 1’s M3 electrical air heater. 6 Connect connector (5) , wire 136A, to gunner’s M3 electrical air heater.