TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 440 of 828
TM 9–2350–311–20–2 8–16 8–3 PANORAMIC TELESCOPE TO DOME LIGHT LEAD ASSEMBLY This task covers: a. Removal b. Disassembly c. Testing d. Assembly e. Installation INITIAL SETUP Test Equipment Multimeter (item 6, Appx H) Tools Artillery and turret mechanic’s tool kit (SC 5180–95–CL–A12) Materials/Parts Lockwashers (12) (item 86, Appx G) Self-locking nuts (3) (item 184, Appx G) Tape, black (electrical) (item 39, Appx D) Equipment Condition Disconnect batteries (TM 9–2350–311–10) POWER RELAY BOX DOME LIGHT ASSEMBLY GUNNER’S SELECTOR SWITCH BOX ASSEMBLY DOME LIGHT ASSEMBLY 138 138 147A 147C 147B M117/M117A2 PANORAMIC TELESCOPE