TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 420 of 828
TM 9–2350–311–20–2 7–14 Change 3 7–3 RAMMER RELIABILITY CHECKS This task covers: a. Reliability checks b. Inspection INITIAL SETUP Tools Artillery and turret mechanic’s tool kit (SC 4933–95–A12) Materials/Parts CLP (item 8, Appx D) Lockwire (item 33, Appx G) References TM 9–2350–311–10 Equipment Condition Breech opened (TM 9–2350–311–10) a. Reliability Checks 1 Unlatch rammer assembly (1), position, and restow rammer. (a) Check for operation of main release handle (2), support assemblies (3), and rammer safety pointer (4). (b) Check for hose assemblies interfering with rammer support assembly during stowing. (c) Position rammer for ramming operation. (d) Turn on MASTER switch (5) and CAB POWER switch to ON (6). 1 2 3 4 6 5