TM-9-2350-311-20-2 Maintenance Manual Volume 2 for M109 Cab Download
Page 374 of 828
TM 9–2350–311–20–2 6–52 Change 2 6–21 GUNNER’S/ASSISTANT GUNNER’S CONTROL ASSEMBLY HANDLES This task covers: a. Removal b. Installation INITIAL SETUP Tools Artillery and turret mechanic’s tool kit (SC 5180–95–CL–A12) Materials/Parts Sealing compound (item 27, Appx D) Equipment Condition Gunner’s control assembly removed (para 6–19) Assistant gunner’s control assembly removed (para 6–20) NOTE • Some handles may have the gunner’s control lead assembly in place during removal. They are not to be reassembled during the installation procedure. • Use identical service procedures for both the left and right handle assemblies. a. Removal 1 Remove shoulder screw (1) from handle (2) through access hole in bracket and housing group (3). 2 Remove setscrew (4) and straight shaft (5) from bracket and housing group (3). 3 Remove handle (2) from bracket and housing group (3). NOTE Retain shims unless new components are to be installed. 4 Remove shims (6) from bracket and housing group (3). NOTE If gunner’s control lead assembly is connected to the gunner’s control assembly handle, go to step 5. 5 Remove two cap screws (7) and two lockwashers (8). 6 Remove cap screw (9) and lockwasher (10). 7 Separate left and right handle halves (11 and 12). 8 Drive out headless straight pin (13). 9 Disconnect gunner’s control lead assembly (14) from setscrews (15).